D
Thanks Received
0

Profile posts Latest activity Postings About

  • Hello,
    Any chance you could let me know what you did with the basement flat floor in the end?
    Have the exact same situation. Considering limecrete with ASHP + UFH. Bodge job of waterproofing performed historically with membranes approx 1.5m above the floor level. A couple of the walls retaining soil.
    Thanks in advance..
  • Loading…
  • Loading…
  • Loading…
Back
Top