OK so here is what I have done. Put in pipework to new rad, drained down full system, moved rad to new location on adjacent wall
Connected back up
Re filled sealed system to 1 bar cold.
From upstairs bled all rads
Re filled loop to 1 bar as many times as necessary.
Starting with moved rad bled...