Sorry, this is a nested question..
Old suspended 1960s floor comprises:
3" void, 3" timber heights (sat on engineering bricks, levelled with cement), floorboards.
Joist spacing sees 440mm approx inbetween joists. Joists are 2.5" wide.
Goals:
- insulate between timbers
- UFH: install over tray...