I'm extending an existing patio in heavy clay soil. I've dug out the new area of 2x3m but between this and the existing patio is a trench of gravel (pea shingle), about 200mm below the patio level.
The gravel fill itself is 2m long (the short length of the new dig out), 400mm wide and about...