I’ve attached a drawing to show the existing, temporary and final diagrams to help show the question.
The structural engineer has designed our loft with 2 floor steels and a ridge steel. The installation of the first floor steel (beam A) is simple, as nothing needs to be removed to install it...
Hello forum! First time post here.
I am a fairly handy amateur carpenter and had a builder come around to replace the floor in my shed, which was very rotted with wood worm (it was the removal that I couldn't do, as the rot creaped me out).
While his construction method was good, he made a...