I did my basins 32mm waste pipe earlier, 3 solvent weld joints. The pot said wait 15 mins before handling, nothing about testing.
I just ran some water down it with a hose, about 1.5 hrs/2 hrs after doing the pipes.
Is this enough? The internet says lots of different stuff, some saying 24...