well

  1. mikey1123

    Manhole/Inspection Chamber Filling with groundwater! Please Help

    Hello Everyone. We have recently had a 400ft Deep Bore Well Drilled on our land. The well contractor made us excavate 2 feet below the well head (Challenging as we are right ontop of the bedrock/granite) and then returned to install the pump and told us to build a chamber around the well head...
Back
Top