Am getting my meters moved.
500 thk wall - made up of 100 conc. block, 50 void, 350 breeze.
re the 38mm hole that takes the gas pipe (in a plastic duct) from the proposed wall mounted meter cab to a ground floor bathroom.
Does this hole have to be drilled level? Or can it be drilled to falls...