Hi all,
So I need to level 9sqm of a kitchen that also flows through to a 19sqm reception room.
Now, the kitchen starts off concrete, then goes to those ancient vinyl type tiles on what looks like a bitumen base (I’ve scraped most of these off now), then an open archway into the reception which is covered in 20mm thick square tiles, again these are ancient. House was built in 1901. It also has some concrete areas that has been painted.
Had a quote from somene who said we need a “smoothing” compound, then a sealer (f-ball rings a bell), then the screed/levelling compound. All 3 would add around 16-20mm of depth.
The quote came in at over £1200, which I thought was expensive.
I can post some pics of the floors tomorrow (maybe), but would welcome advice in the meantime.
cheers
So I need to level 9sqm of a kitchen that also flows through to a 19sqm reception room.
Now, the kitchen starts off concrete, then goes to those ancient vinyl type tiles on what looks like a bitumen base (I’ve scraped most of these off now), then an open archway into the reception which is covered in 20mm thick square tiles, again these are ancient. House was built in 1901. It also has some concrete areas that has been painted.
Had a quote from somene who said we need a “smoothing” compound, then a sealer (f-ball rings a bell), then the screed/levelling compound. All 3 would add around 16-20mm of depth.
The quote came in at over £1200, which I thought was expensive.
I can post some pics of the floors tomorrow (maybe), but would welcome advice in the meantime.
cheers