Half way though a kitchen refurb and got a shock when I was quoted 2k for plastering. Now 2 walls will need battening but the room is less than 3x5. Some is awkward and some will need browning rather than boarding. Also having the ceiling overboarding.
I live in Berkshire and the walls are back to brick.
Does this seem accurate or on the steep side?
I live in Berkshire and the walls are back to brick.
Does this seem accurate or on the steep side?