I'm preparing the groundwork for a timber decking frame but I don't have much height as I'm keeping it level with my newly installed patio.
The ground has already been dug off and filled with MOT so is compact.
I have started to channel out small trenches so I can concrete in 3x2 treated timber.
To save me time, could I get away with 2x2 treated timber concreted directly onto the hardcore as there will be no flex to worry about?
The ground has already been dug off and filled with MOT so is compact.
I have started to channel out small trenches so I can concrete in 3x2 treated timber.
To save me time, could I get away with 2x2 treated timber concreted directly onto the hardcore as there will be no flex to worry about?