I'm tiling a bathroom and now got to make the bath panel to be tiled?
I was thinking to to make a structure panel in stud work and plywood 12mm, then tiling on it straight away.
Would this work? is the plywood good enough for wet area?
I was thinking to to make a structure panel in stud work and plywood 12mm, then tiling on it straight away.
Would this work? is the plywood good enough for wet area?