Hi guys,
Flat in spain ( but no difference as far as i can see) Bathroom Light fitting has 3 wires brown L blue N green ( checked on other lights connected in other rooms) so looking to set up 4 LED down lights ip65 built in drivers.
Using 1.5 twin and earth joining earths by Junctions and terminating in a single junction box taped as per pictures, no lights yet!
All wires in place holes drilled etc .
Its a floating ceiling easily accessible by moving plaster tiles to gain access.
May tie wrap cables up once all in place as ive read they need securing?
As this is still an existing circuit not a new one does it need signing off ?
Any thoughts would be appreciated
Thanks
Read more: https://www.diynot.com/diy/threads/bathroom-spotlights-españa.569175/#ixzz6sDEKf4DN
Flat in spain ( but no difference as far as i can see) Bathroom Light fitting has 3 wires brown L blue N green ( checked on other lights connected in other rooms) so looking to set up 4 LED down lights ip65 built in drivers.
Using 1.5 twin and earth joining earths by Junctions and terminating in a single junction box taped as per pictures, no lights yet!
All wires in place holes drilled etc .
Its a floating ceiling easily accessible by moving plaster tiles to gain access.
May tie wrap cables up once all in place as ive read they need securing?
As this is still an existing circuit not a new one does it need signing off ?
Any thoughts would be appreciated
Thanks
Read more: https://www.diynot.com/diy/threads/bathroom-spotlights-españa.569175/#ixzz6sDEKf4DN