Hi All,
My first post here, in what seems a great forum.
I'm currently refitting our bathroom, which i'm sure you will agree was a bit dated. I will post pics here and also other info and would love constructed critisism and offers of info.
Budget £800
Project: To completely refurbish bathroom.
New Hardward:-
Tiles to Floor
Tiles to 2/3rds Wall
Bath
Basin
Toilet
Shower
Shower Pump
Chrome Towel Radiator
New connectors and valves to all fittings (there are none)
Light Fitting
Chrome / Glass Furniture
I'm sure there's more!
Before Destruction!
Part Way Through
I've now taken out the majority of the tiles, stripped the wallpaper, sanded all the walls and woodwork. I intend to PVA the tiled walls before putting any tiles up and replace some rotten wood from around the bath.
Q: I was thinking of taking the skirting board off and putting 3 or 4 inches of floor tile in its place to finish off the floor, what are peoples thoughts on this?
My first post here, in what seems a great forum.
I'm currently refitting our bathroom, which i'm sure you will agree was a bit dated. I will post pics here and also other info and would love constructed critisism and offers of info.
Budget £800
Project: To completely refurbish bathroom.
New Hardward:-
Tiles to Floor
Tiles to 2/3rds Wall
Bath
Basin
Toilet
Shower
Shower Pump
Chrome Towel Radiator
New connectors and valves to all fittings (there are none)
Light Fitting
Chrome / Glass Furniture
I'm sure there's more!
Before Destruction!
Part Way Through
I've now taken out the majority of the tiles, stripped the wallpaper, sanded all the walls and woodwork. I intend to PVA the tiled walls before putting any tiles up and replace some rotten wood from around the bath.
Q: I was thinking of taking the skirting board off and putting 3 or 4 inches of floor tile in its place to finish off the floor, what are peoples thoughts on this?