- Joined
- 20 Apr 2021
- Messages
- 47
- Reaction score
- 2
- Country
I've got a 4" deep timber frame on top of paving slabs ready to fill in before the artificial grass arrives. The area is 4m x 5.5m.
I have a couple of questions:
- Should I remove some or all of the paving slabs before filling the frame in? Is there any benefit/harm to keeping the slabs?
- What would be the best way to fill in the timber frame? Someone suggested just 3 tonnes of sharp sand, but I heard that would get lumpy and bumpy with not great drainage.
I've got spare soil and stone chips lying around, just in case they could be used to fill in some of it.
Thanks a lot in advance for any suggestions.
I have a couple of questions:
- Should I remove some or all of the paving slabs before filling the frame in? Is there any benefit/harm to keeping the slabs?
- What would be the best way to fill in the timber frame? Someone suggested just 3 tonnes of sharp sand, but I heard that would get lumpy and bumpy with not great drainage.
I've got spare soil and stone chips lying around, just in case they could be used to fill in some of it.
Thanks a lot in advance for any suggestions.