Hi
I’ve realised an issue with my extension and hoping for a little input.
The building officer has said to cut the brickwork vertically to open the cavity up and I can then tooth the brickwork. The bricks under the lintel (pictured) will then be removed and blockwork rebuilt under it and joined to new.
However, I’ve only just realised that the old cavity is 50-75mm and new is 100mm so the block work isn’t going to align!
It means they’ll be a 25mm or so offset on the join, is this okay or does anyone have a better way?
I’ve realised an issue with my extension and hoping for a little input.
The building officer has said to cut the brickwork vertically to open the cavity up and I can then tooth the brickwork. The bricks under the lintel (pictured) will then be removed and blockwork rebuilt under it and joined to new.
However, I’ve only just realised that the old cavity is 50-75mm and new is 100mm so the block work isn’t going to align!
It means they’ll be a 25mm or so offset on the join, is this okay or does anyone have a better way?