Hi,
I live in Eastbourne and have a gravity heating system, the boiler has failed and been capped off by the gas board.
I received the following quotes from a local company to just replace the boiler and another to change to a combi.
I would be very grateful if somebody can advise me if these quotes are reasonable? The combi option appears quite pricy and is the one I really wanted.
Many thanks in anticipation.....
Boiler replacement
£2,300.00
To replace current heat only boiler with alpha etec 15R heat only boiler. System to stay the same
To add magnetic filter onto system
To add inhibitor to heating system
To supply boiler and all materials
Boiler to come with 7 years warranty
Duration work 1-2 days
Combi boiler
£4,200.00
To convert from heat only system to a combi boiler and to supply and install alpha etec 33 plus combi boiler
To remove hot water cylinder and water tanks in loft
To install new thermostat. To add new filter
To supply all materials
Boiler to come with 10 years warranty
Duration of work 2-3 days
Power shower
£520.00
To replace mira event xs power shower like for like
To supply shower unit
Subtotal
£7,020.00
Total
£7,020.00
I live in Eastbourne and have a gravity heating system, the boiler has failed and been capped off by the gas board.
I received the following quotes from a local company to just replace the boiler and another to change to a combi.
I would be very grateful if somebody can advise me if these quotes are reasonable? The combi option appears quite pricy and is the one I really wanted.
Many thanks in anticipation.....
Boiler replacement
£2,300.00
To replace current heat only boiler with alpha etec 15R heat only boiler. System to stay the same
To add magnetic filter onto system
To add inhibitor to heating system
To supply boiler and all materials
Boiler to come with 7 years warranty
Duration work 1-2 days
Combi boiler
£4,200.00
To convert from heat only system to a combi boiler and to supply and install alpha etec 33 plus combi boiler
To remove hot water cylinder and water tanks in loft
To install new thermostat. To add new filter
To supply all materials
Boiler to come with 10 years warranty
Duration of work 2-3 days
Power shower
£520.00
To replace mira event xs power shower like for like
To supply shower unit
Subtotal
£7,020.00
Total
£7,020.00