Hi - I am feeling a bit lost and would love some advice! I had French doors put in place of a window on my first floor about 2 years ago. There had previously been a window of this size in place as the brickwork was different (although a much smaller one was in place when I moved in) so the builder used whatever lintel was already in place and did not use a new RSJ.
As you can see the brickwork above is now bowing and I would like advice on whether an RSJ should be retrospectively fitted and how I go about talking to the builder about this?! Building regs did sign this off when installed but only did a very quick visit to sign off numerous things. Also, if work needs doing, will this ruin everything internally I.e. new plaster and decoration?
Thankful for any advice!
As you can see the brickwork above is now bowing and I would like advice on whether an RSJ should be retrospectively fitted and how I go about talking to the builder about this?! Building regs did sign this off when installed but only did a very quick visit to sign off numerous things. Also, if work needs doing, will this ruin everything internally I.e. new plaster and decoration?
Thankful for any advice!