Build Over Agreement

Joined
19 Apr 2016
Messages
3
Reaction score
0
Country
Malaysia
Does anyone know where I can get a sample of a Build Over Agreement?

A Build Over Agreement when building over sewerage
 
Does anyone know where I can get a sample of a Build Over Agreement?

A Build Over Agreement when building over sewerage
Are these generic or job specific?

I've not seen one but have built over many sewers. I think it mainly deals with the gap around the drain and the drain itself. In other words, if your lintel clears the pipe by say 100mm and around the sides and if you renew the pipe in plastic with correct couplers, correct granular bedding etc, then you pretty much have it sorted.
 
They are job specific and are produced by the water company (the owner of the sewer)
 
Some water companies require a Build Over Agreement to be signed. It would cover access for maintenance, liabilities during constructions, damages to pipes, raising of the manhole etc .

Id like to have a look at a sample of the agreement if possible just to get an idea of what I should look out for and what to expect
 
Back
Top