Gah, I’m in a pickle.
I’m having internal walls and ceilings/flat roof insulated as part of my journey towards getting an ASHP/more energy efficient house. Most of the walls are 1960s build cavity walls, assumed insulated on the EPC.
I’ve had an energy consultant and various builders quote for this insulation work and none have mentioned building regs…but now, 2 days into the work, I’m pretty sure I need building regs. So, GAH!
But I’m also pretty sure building regs will require me to put really thick insulated plasterboard on my small cottage room walls and make them even smaller…! Is there no leeway for old/small houses?? I also worried the Hybris + 38mm insulated Celotex plasterboard that’s already been put on the flat roof won’t be enough and will have to come down/out (R value Hybris 2.9, Celotex 1.2, which takes U value to 0.25 I think, which is higher than the figures I can find for building regs).
I assume this is a case of ‘stop all work and get building regs onto it ASAP’?? If I get building regs after the work, I’m worried it won’t comply, and it feels like an expensive assumption to make that it will…
I’m having internal walls and ceilings/flat roof insulated as part of my journey towards getting an ASHP/more energy efficient house. Most of the walls are 1960s build cavity walls, assumed insulated on the EPC.
I’ve had an energy consultant and various builders quote for this insulation work and none have mentioned building regs…but now, 2 days into the work, I’m pretty sure I need building regs. So, GAH!
But I’m also pretty sure building regs will require me to put really thick insulated plasterboard on my small cottage room walls and make them even smaller…! Is there no leeway for old/small houses?? I also worried the Hybris + 38mm insulated Celotex plasterboard that’s already been put on the flat roof won’t be enough and will have to come down/out (R value Hybris 2.9, Celotex 1.2, which takes U value to 0.25 I think, which is higher than the figures I can find for building regs).
I assume this is a case of ‘stop all work and get building regs onto it ASAP’?? If I get building regs after the work, I’m worried it won’t comply, and it feels like an expensive assumption to make that it will…