I am taking down a structural wall between a conservatory and the house, and I have tried to do all the right things by getting building control involved before we got a builder etc and getting structual calcs, but we are now on our third building control officer, and each has wanted something differant, the latest wants nthe foundations of the hose exposed, which means gigging up 6 inches of concrete.
Can they ask for this ? all we are doing is taking out a central piller as there is a door and window there
Can they ask for this ? all we are doing is taking out a central piller as there is a door and window there