- Joined
- 31 May 2020
- Messages
- 213
- Reaction score
- 13
- Country
Hi all
I’m preparing my floor ready to self level. I removed a section of loose concrete, and on removing this I identified two copper pipes which were underneath and around this
Will it be okay to fill this gap with ready made concrete prior to self levelling over the top?
Many thanks for your help
I’m preparing my floor ready to self level. I removed a section of loose concrete, and on removing this I identified two copper pipes which were underneath and around this
Will it be okay to fill this gap with ready made concrete prior to self levelling over the top?
Many thanks for your help