Hi Guys,
I will be filling my cavity as per title over the weekend prior to backfilling and compacting the ground.
I know i need to use 8 part balast to 1 part cement gfor the mix...but i have read conflicting messages about the consistency of the mix....should it be wet or dry?
Also i have bridging at 2 sections (water and electric services)...how do i stop the concrete running out of the opening under the lintel.....(my dpc level is 1500mm to the concrete foundation in some places).
Thanks.
I will be filling my cavity as per title over the weekend prior to backfilling and compacting the ground.
I know i need to use 8 part balast to 1 part cement gfor the mix...but i have read conflicting messages about the consistency of the mix....should it be wet or dry?
Also i have bridging at 2 sections (water and electric services)...how do i stop the concrete running out of the opening under the lintel.....(my dpc level is 1500mm to the concrete foundation in some places).
Thanks.