I'm putting up a fence on a slope and I'm using concrete fence posts.
The posts have pre drilled holes for bolting on the cross rails.
I'm thinking if each post is buried at the same depth along the slope, then the holes should line up from post to post, allowing the crossrails to follow the slope of the ground, am I right?
The posts have pre drilled holes for bolting on the cross rails.
I'm thinking if each post is buried at the same depth along the slope, then the holes should line up from post to post, allowing the crossrails to follow the slope of the ground, am I right?