First post so I will introduce myself ,I am a tiler who is currently having an extension built by my neighbour who is a general builder/ brick layer
We are very early in the build and have just had the foundations dug out the builder had to go deeper than usual as we had a sewer main running parralel with the outside edge of the footing and building control asked us to ensure that the footing was deeper than the sewer as so not to put any stress on the pipe
While digging out the footing the builder discovered our water main cuts across the trench in 2 places , I asked him how he would deal with this and he told me he would shutter around it prior to concreting
Yesterday was the day of the pour and I was surprised to see he had decided to mix the concrete on site he didn't seem to have any where near enough ballast but reassured me that it was being delivered through out the day ,
I called building control to ask for an inspection and the surveyor came out , she knocked on my door and told me she had several issues with what the guy was doing he had thrown several,large lumps of concrete which had previously been our patio , into the trench and she demanded to speak with him as she wanted them removed .
After she left he seemed upset that she was interfering and told me there was nothing wrong with what he was doing , he continued to add some broken pieces of concrete to the trench and when I returned from a hospital appointment I asked him why he had not finished ? He told me that they had been let down by the delivery of the ballast but not to worry that he would finish pouring the concrete the following day ,
I was concerned as he hadn't shuttered around the water main and just stuffed a couple of broken slabs around it on one side of the trench and told be he would put a lintel over it to protect it when he the concrete tomorrow
I then asked he not to put any more broken pieces of concrete on the second pour and if was a question of money I would cover any costs involved for extra materials
Sorry for the long essay but I can't sleep as I am worrying about the stae of my foundations and worried about this water main
We are very early in the build and have just had the foundations dug out the builder had to go deeper than usual as we had a sewer main running parralel with the outside edge of the footing and building control asked us to ensure that the footing was deeper than the sewer as so not to put any stress on the pipe
While digging out the footing the builder discovered our water main cuts across the trench in 2 places , I asked him how he would deal with this and he told me he would shutter around it prior to concreting
Yesterday was the day of the pour and I was surprised to see he had decided to mix the concrete on site he didn't seem to have any where near enough ballast but reassured me that it was being delivered through out the day ,
I called building control to ask for an inspection and the surveyor came out , she knocked on my door and told me she had several issues with what the guy was doing he had thrown several,large lumps of concrete which had previously been our patio , into the trench and she demanded to speak with him as she wanted them removed .
After she left he seemed upset that she was interfering and told me there was nothing wrong with what he was doing , he continued to add some broken pieces of concrete to the trench and when I returned from a hospital appointment I asked him why he had not finished ? He told me that they had been let down by the delivery of the ballast but not to worry that he would finish pouring the concrete the following day ,
I was concerned as he hadn't shuttered around the water main and just stuffed a couple of broken slabs around it on one side of the trench and told be he would put a lintel over it to protect it when he the concrete tomorrow
I then asked he not to put any more broken pieces of concrete on the second pour and if was a question of money I would cover any costs involved for extra materials
Sorry for the long essay but I can't sleep as I am worrying about the stae of my foundations and worried about this water main