I am laying a curved path in the back garden using 600 x 300 pavers. Its about 4m long and the gaps between the pavers will 20mm pebbles. The idea is that the path will be 1m wide and the sides filled in with pebbles. It doesnt get that much use.
1st question:
Looking on paving expert it says that for paving you dont have to have a sub base ( but it doesnt do any harm) So I was thinking of a sort of compromise and going around 50-60mm after compacting would that be ok?
2nd question:
I have seen advice on laying the slabs on a cement / sand mix ( wet I presume) but also just a 25mm layer of sand. Which would be better in my situation? I appreciated the use/ non use of sub base will affect the answer.
Final question:
As said the slabs are 600mm wide with the path 1m wide. At the moment I have some metal edging which is fitted in 50mm wider each side.
The idea was to lay the mot down and compact it, lay the slabs and when all set remove the edging, refit it to the 1m wide and lay the pebbles. The reasoning is so that the good lady can plant herbs etc in the gravel at the side.
Is this at all viable or will the subbase collapse when the 1st set of edging is removed?
As ever thanks in advance
1st question:
Looking on paving expert it says that for paving you dont have to have a sub base ( but it doesnt do any harm) So I was thinking of a sort of compromise and going around 50-60mm after compacting would that be ok?
2nd question:
I have seen advice on laying the slabs on a cement / sand mix ( wet I presume) but also just a 25mm layer of sand. Which would be better in my situation? I appreciated the use/ non use of sub base will affect the answer.
Final question:
As said the slabs are 600mm wide with the path 1m wide. At the moment I have some metal edging which is fitted in 50mm wider each side.
The idea was to lay the mot down and compact it, lay the slabs and when all set remove the edging, refit it to the 1m wide and lay the pebbles. The reasoning is so that the good lady can plant herbs etc in the gravel at the side.
Is this at all viable or will the subbase collapse when the 1st set of edging is removed?
As ever thanks in advance