Hi I'm going to do a 3.6m x 3.6m patio, I'll be using, new paving, but nothing fancy just plain 600mm x 50mm, with a mortar base of 40mm.
So what depth should my sub base be, I'm reading that the standard should be 75mm, just wondering though could I get away with 50mm, it isn't soft soil, and fairly untouched, apart from me digging out the weeds, there's
lots of stones all sizes in the soil as well so I'm going to separate them and use as part of the sub base, though I will use proper mot type 1 as well, just trying to save on sub base if I can maybe squeeze by with just a tonne, or would the stones I have not mix well with the mot type 1, none are larger than roughly 40mm, and I would toss any bigger ones, eg wouldn't compact the same, or is a stone a stone lol,Thanks
So what depth should my sub base be, I'm reading that the standard should be 75mm, just wondering though could I get away with 50mm, it isn't soft soil, and fairly untouched, apart from me digging out the weeds, there's
lots of stones all sizes in the soil as well so I'm going to separate them and use as part of the sub base, though I will use proper mot type 1 as well, just trying to save on sub base if I can maybe squeeze by with just a tonne, or would the stones I have not mix well with the mot type 1, none are larger than roughly 40mm, and I would toss any bigger ones, eg wouldn't compact the same, or is a stone a stone lol,Thanks