We recently lowered the floor in our victorian terrace by approx 15cm. But to do this our builder had to dig the soil down approx 50cm below the brick wall footings before bringing the level back up again with hardcore/concrete/insulation/screed then tiles. Is this against building regs? And can anyone point me to the relevant Building Control rules or Building Regs ??