Hi All,
The mother in law has recently purchased a mobility scooter and has asked if I could build a concrete ramp up to the level of the PVC door threshold.
This is my first concreting project and just had a couple of questions (I'll be using Blue Circle High Strength Concrete as this is what Blue Circle recommended for the project);
-this concrete ramp will be laid over am existing concrete path up to the front door. The max thickness of the new concrete ramp will be 100mm feather down to 10mm. How long do you reckon it will be before we can walk on the new concrete ramp as obviously assess will be required to the front door ASAP?
-is there any issue with laying the concrete against the PVC door frame so that the top of the ramp meets the height of the threshold?
-I'll lay some polythene sheeting over the new concrete for around 7 days, is that correct? Anything else I should be aware of?
Cheers,
Jimmy
The mother in law has recently purchased a mobility scooter and has asked if I could build a concrete ramp up to the level of the PVC door threshold.
This is my first concreting project and just had a couple of questions (I'll be using Blue Circle High Strength Concrete as this is what Blue Circle recommended for the project);
-this concrete ramp will be laid over am existing concrete path up to the front door. The max thickness of the new concrete ramp will be 100mm feather down to 10mm. How long do you reckon it will be before we can walk on the new concrete ramp as obviously assess will be required to the front door ASAP?
-is there any issue with laying the concrete against the PVC door frame so that the top of the ramp meets the height of the threshold?
-I'll lay some polythene sheeting over the new concrete for around 7 days, is that correct? Anything else I should be aware of?
Cheers,
Jimmy