Hi

can any one see any issues with this plan I’ve had done.

I can understand how I don’t have a beam for the ridge with I have the dormer timbers connecting straight to the rafters
 

Attachments

  • 6B7A4DC1-0D96-4D9C-80B7-263185230F98.png
    6B7A4DC1-0D96-4D9C-80B7-263185230F98.png
    447.8 KB · Views: 80
  • C05995BE-D979-420F-82A0-261212E07C7F.png
    C05995BE-D979-420F-82A0-261212E07C7F.png
    616.9 KB · Views: 79
You need enough detail and drawings for a builder to be able to build it without guesswork.
 
Do you have structural engineers drawings? Are you doing this on a Notice or as a Full Plans application? Diying or employing a builder?
 
No I don’t have structural engineering drawings, just architectural drawings showing beam sizes.

This is approved notice work as it’s below 50m2 and also i might to it myself.

im just struggling with no ridge beam to take the load when 99% of dormers have them and not a ridge board
 
the architect has used a structural engineer and submitted all of these with the building notice application which is approved.
 
No I haven’t, got a couple of questions really as it should have a beam holding the roff up to the dormer
 