I have a timber frame structure mounted on concrete blocks around the perimeter, which are bedded on a concrete base.The concrete base has a membrane but is cut off flush.
as i'm doing a solid floor inc Ufh made up of 150mm celotex , a seperation layer then UFH stapled on top , before a 75mm screed to finish should I :
Also Put polythene down before the celotex as well so it can drape up around the edge meeting the damp course above the concrete block level ??
see image
as i'm doing a solid floor inc Ufh made up of 150mm celotex , a seperation layer then UFH stapled on top , before a 75mm screed to finish should I :
Also Put polythene down before the celotex as well so it can drape up around the edge meeting the damp course above the concrete block level ??