Hi all,
About to start some major renovations of the bathroom. This will require the removal of the boiler and likely not be a new one installed for about 6 months. (new extension)
If i drain down the system and just leave all the rads empty will they it be ok when the new boiler goes on?
I don't need to leave it all with water and inhibitor in all the rads?
About to start some major renovations of the bathroom. This will require the removal of the boiler and likely not be a new one installed for about 6 months. (new extension)
If i drain down the system and just leave all the rads empty will they it be ok when the new boiler goes on?
I don't need to leave it all with water and inhibitor in all the rads?