Hi Guys,
I have made an 85cm x 75cm concrete formed countertop (40mm (4cm) thickness). Currently, this is the third day, I removed the concrete from the melamine form and its perfect. I have covered it with sheeting and kept it wet thoroughly since day 1 every day, I will continue to do this for 7 days recovering after every wetting process to help with the cure.
I am planning to epoxy pigment colour the concrete countertop, though, when do I do this ? can I do this after 7 days or do I wait the whole 28-30 days strength time for the concrete to reach maximum strength?
Thanks in advance.
I have made an 85cm x 75cm concrete formed countertop (40mm (4cm) thickness). Currently, this is the third day, I removed the concrete from the melamine form and its perfect. I have covered it with sheeting and kept it wet thoroughly since day 1 every day, I will continue to do this for 7 days recovering after every wetting process to help with the cure.
I am planning to epoxy pigment colour the concrete countertop, though, when do I do this ? can I do this after 7 days or do I wait the whole 28-30 days strength time for the concrete to reach maximum strength?