Where is the bonding cable to be attached to the gas pipe now that the gas meter has been moved? The old bonding was attached to a forged steel 90% elbow on the top of the meter but the new meter has 22mm copper going in to the meter top.
You can see where the olde worlde fuse box was sited and painted around in yellow.
6mm O/D dia. earth tails drop down from new cu in the room above, to shared block. A new earth coming up from new electricity meter location (hole with expanded foam) I think one of the old earth tails went to the previous gas meter site, after vanishing in to the plaster, but think that both of that pair sunk in the wall are redundant now anyway.
Does the bonding need to be attached in the meter box? Or can it be attached inside the house? I saw a mention of within 600mm of meter and that could just about be managed. What is the min. size earth cable allowable? The earth tails from the new cu are 6mm O/D inc. insulation.View attachment 170316
You can see where the olde worlde fuse box was sited and painted around in yellow.
6mm O/D dia. earth tails drop down from new cu in the room above, to shared block. A new earth coming up from new electricity meter location (hole with expanded foam) I think one of the old earth tails went to the previous gas meter site, after vanishing in to the plaster, but think that both of that pair sunk in the wall are redundant now anyway.
Does the bonding need to be attached in the meter box? Or can it be attached inside the house? I saw a mention of within 600mm of meter and that could just about be managed. What is the min. size earth cable allowable? The earth tails from the new cu are 6mm O/D inc. insulation.View attachment 170316