Hi All,
I have a Flexicom 24hx Boiler about 6 years old, Been fine till about 2 months ago,
then one morning it didn't come on, F22 Code. I re-set it and all was fine.
Then 2 days later the same, and then F5 then off again, this went on for about four or 5 days.
I called a Boiler company and a young man came couldn't find anything wrong and
said it need a powerflush. Strangely he didn't try and sell us anything else, I was out while
he was here, so a couple of days later I had the system Power Flushed, they said it would cure all the problems,.. it was fine when they left, then the next day F22, F22, F22.
So looking at various forms they recommended, Checking all the rads, bleeding etc.
which worked for about 5 weeks. But now I'm back again F5 or F22.
Someone said it could be the pump or position of the pump. It about 30ft from the boiler
in the loft, if quite a large central heating system 12 Rads, as the house was extended over time and the rads have been added.
So anyone have any ideas ? I'm loathed to get another engineer in as I've already spent
over £600.00 and I no further forward than when I started.
I have a Flexicom 24hx Boiler about 6 years old, Been fine till about 2 months ago,
then one morning it didn't come on, F22 Code. I re-set it and all was fine.
Then 2 days later the same, and then F5 then off again, this went on for about four or 5 days.
I called a Boiler company and a young man came couldn't find anything wrong and
said it need a powerflush. Strangely he didn't try and sell us anything else, I was out while
he was here, so a couple of days later I had the system Power Flushed, they said it would cure all the problems,.. it was fine when they left, then the next day F22, F22, F22.
So looking at various forms they recommended, Checking all the rads, bleeding etc.
which worked for about 5 weeks. But now I'm back again F5 or F22.
Someone said it could be the pump or position of the pump. It about 30ft from the boiler
in the loft, if quite a large central heating system 12 Rads, as the house was extended over time and the rads have been added.
So anyone have any ideas ? I'm loathed to get another engineer in as I've already spent
over £600.00 and I no further forward than when I started.