We are in the middle of a small kitchen extension and have installed wet UFH over insulation and screed which was laid on 13th December. We have engineered wood flooring to be installed on top (glue down).
Our builder is now saying because the flooring is glue down it will need more drying time than if it were a click flooring or tiles. He says with tile it could be laid 3 days after laying the screed, and click flooring 2 weeks - but everything I am researching says the screed needs to be properly cured before any flooring can be laid, so realistically still a few weeks/months for our 60mm screed regardless of floor choice.
I’d also read that the UFH should be commissioned before any flooring is laid but he hasn’t even connected it to the boiler yet.
Can anyone help shed some light on this please? Would love a second opinion as it’s not levelling up with everything I’m reading!
Thanks in advance.
Our builder is now saying because the flooring is glue down it will need more drying time than if it were a click flooring or tiles. He says with tile it could be laid 3 days after laying the screed, and click flooring 2 weeks - but everything I am researching says the screed needs to be properly cured before any flooring can be laid, so realistically still a few weeks/months for our 60mm screed regardless of floor choice.
I’d also read that the UFH should be commissioned before any flooring is laid but he hasn’t even connected it to the boiler yet.
Can anyone help shed some light on this please? Would love a second opinion as it’s not levelling up with everything I’m reading!
Thanks in advance.