1.currentley renovating the bathroom, at the stage where i have a plumber coming to fit shower tray/ bath/ pipe work etc...do i plaster the walls 1st, then fit the bath and shower tray, then tile. Or would it be better to fit the shower tray and bath and plaster down to them for a better seal...
2.I have stripped off old tiles in bathroom back to bear wall...do i apply a bonding coat to wall, then unibond to seal then start tiling....or apply bond coat/ then skim wall to seal, then tile?
2.I have stripped off old tiles in bathroom back to bear wall...do i apply a bonding coat to wall, then unibond to seal then start tiling....or apply bond coat/ then skim wall to seal, then tile?