Hi all. newbie here. We had a survey done on a 1930s house we're buying. Having had a chat to the surveyor my paraphrased write up of his comments are below
"Roof – timber structure is fine. All roof timber is dry. Tiles still have life left in them, but replace in the mid term. Some gaps on rear elevation and tidying up needed. Roof is boarded under the tiles which is good, but feels humid as little ventilation and lots of insulation, soffit boarding could be rotted in areas. Soffit board looks to be timber, but asbestos on left side (looking from front).
Some damp on loft floor, but isolated to 4-5 patches so localised. Roof needs patching as above. But again, no ventilation can exasperate the issue and cause rot if not dealt with.
Chimney – some damp around chimney in the loft. Roof finishing here is tiling and mortar. Best to change to lead flashing."
So my understanding of what is needed to make good in the short term is
1) replace tiles or re-mortar as needed (4-5 places?).
2) remove some insulation and replace soffit boards with ventilated items
3) Lead flashing to be added to chimney.
I've not had to do any roofing work on any previous house. Should I be budgeting less than £2k or £2k to £5k or higher still? Thanks.
"Roof – timber structure is fine. All roof timber is dry. Tiles still have life left in them, but replace in the mid term. Some gaps on rear elevation and tidying up needed. Roof is boarded under the tiles which is good, but feels humid as little ventilation and lots of insulation, soffit boarding could be rotted in areas. Soffit board looks to be timber, but asbestos on left side (looking from front).
Some damp on loft floor, but isolated to 4-5 patches so localised. Roof needs patching as above. But again, no ventilation can exasperate the issue and cause rot if not dealt with.
Chimney – some damp around chimney in the loft. Roof finishing here is tiling and mortar. Best to change to lead flashing."
So my understanding of what is needed to make good in the short term is
1) replace tiles or re-mortar as needed (4-5 places?).
2) remove some insulation and replace soffit boards with ventilated items
3) Lead flashing to be added to chimney.
I've not had to do any roofing work on any previous house. Should I be budgeting less than £2k or £2k to £5k or higher still? Thanks.