Hi all,
I have a short (5 step) set of pre-built stairs that I need to fix to a Thermalite wall at the top. I'm not sure what the best method would be.
I was thinking of cutting a ledger to the same width as the gap between stringers, rawlbolting it to the wall, and resting the top tread onto it. Then add some large L brackets underneath, to connect the stringers to the ledger.
Would this be a sensible approach, or is there a better way?
Thanks
Tim
I have a short (5 step) set of pre-built stairs that I need to fix to a Thermalite wall at the top. I'm not sure what the best method would be.
I was thinking of cutting a ledger to the same width as the gap between stringers, rawlbolting it to the wall, and resting the top tread onto it. Then add some large L brackets underneath, to connect the stringers to the ledger.
Would this be a sensible approach, or is there a better way?
Thanks
Tim