Hi all,
I hope you are well. I am looking for some advice on our extension and how to close our cavity floor to install a bi-fold door.
Currently we have a 2.05m high by 2.0m wide area for the bi-folds. On the external wall is a layer of stone directly on the blocks which has a DPC and is 100mm higher than the internal wall which is just the blocks currently.
For the walls I assume I just use a 100mm cavity closure but I am not 100% on how to finish off the close for the floor.
Do I build up the internal wall with 100mm block work to be level with the external stone? If so, how do I fill the 100mm cavity and close it off?
The internal floor will have 100mm celotex and 75mm screed. So could you just fill the cavity gap and not build the internal block work up by and install just screed over the area install?
Thanks in advance.
I hope you are well. I am looking for some advice on our extension and how to close our cavity floor to install a bi-fold door.
Currently we have a 2.05m high by 2.0m wide area for the bi-folds. On the external wall is a layer of stone directly on the blocks which has a DPC and is 100mm higher than the internal wall which is just the blocks currently.
For the walls I assume I just use a 100mm cavity closure but I am not 100% on how to finish off the close for the floor.
Do I build up the internal wall with 100mm block work to be level with the external stone? If so, how do I fill the 100mm cavity and close it off?
The internal floor will have 100mm celotex and 75mm screed. So could you just fill the cavity gap and not build the internal block work up by and install just screed over the area install?
Thanks in advance.