I just finished digging 60cm trench for an electric cable. I will re-fill it with the earth that I removed. Is there a special method I should use to ensure the earth is the same density as it was before digging it up? I don't want to have a big mound because all the earth doesn't fit. I also don't want the earth sinking after re-filling.
The earth was very saturated and is made of sand and soil. Maybe some clay.
The earth was very saturated and is made of sand and soil. Maybe some clay.