- Joined
- 28 Apr 2021
- Messages
- 285
- Reaction score
- 3
- Country
I want to fix an 18mm quadrant on top of my stringers, and I'm not sure how to fix them in place. The stringer is currently mostly primed with Zinsser BIN. Should I glue or nail the molding to the stringer, should I also glue them to the wall with something, do I caulk it etc. Thanks!
Attachments
Last edited: