How to prepare surface to lay some tiles along step intio shower?

Joined
13 Apr 2011
Messages
301
Reaction score
6
Location
Antrim
Country
United Kingdom
Can anyone tell me after i clear this out what can I refill it with and let set before I lay some tiles on top? Something very strong and fast setting as I want to have it finished for visitors arriving
 

Attachments

  • 20230902_084653.jpg
    20230902_084653.jpg
    271.8 KB · Views: 56
  • 20230902_084846.jpg
    20230902_084846.jpg
    147.6 KB · Views: 39
Just mix up an extra bit of tile adhesive (assuming you're using powder/cement based) and pad it out with that.
 
Back
Top