I have a section of Timber wall to hang 3 wall cabinets in a row.
There are 4 studs available to connect to with their fixing rail.
The wall has plastered plasterboard on top of 35mm steico protect.
The wall cabinets are 60Wide by 80 high by 37 deep.
Is 4 fixings enough if I use large enough 180-200 long screws into the studs available. the other alternative would be to have the rail come out past the end of the cabinets, ugly as ... but would allow me to get 6 fixing points in.
What is the consensus on this?
There are 4 studs available to connect to with their fixing rail.
The wall has plastered plasterboard on top of 35mm steico protect.
The wall cabinets are 60Wide by 80 high by 37 deep.
Is 4 fixings enough if I use large enough 180-200 long screws into the studs available. the other alternative would be to have the rail come out past the end of the cabinets, ugly as ... but would allow me to get 6 fixing points in.
What is the consensus on this?