Hi
I am nearly at first floor height for my extension and I have made a hole to check the existing floor level. The bottom of the existing floor joists sit level to the bottom of the hole I made and the top of the joists level to the purple line in the picture.
Regs say:
The regs say rebate the straps to allow the floor covering to be laid, so i could do this but they'll need rebating about 30-40mm down the block, is this normal and acceptable?
Hope this makes sense!
I am nearly at first floor height for my extension and I have made a hole to check the existing floor level. The bottom of the existing floor joists sit level to the bottom of the hole I made and the top of the joists level to the purple line in the picture.
Regs say:
- Restraint straps must turn down the cavity by at least 100mm and be tight against the face of the wall.
The regs say rebate the straps to allow the floor covering to be laid, so i could do this but they'll need rebating about 30-40mm down the block, is this normal and acceptable?