I've been a plumber (not heating engineer) for 9 years now and finally bought my first home. As my first project, I decided to install a warm water UFH system.
I've decided on Mapei Latexplan Trade for the screed which will be aprox 20mm thick. The data sheet states max 11mm per coat, however given there's going to be UFH pipes ran through the screed, if this sets and another layer is applied on-top will this affect the pipes/screed?
Thanks, J.
I've been a plumber (not heating engineer) for 9 years now and finally bought my first home. As my first project, I decided to install a warm water UFH system.
I've decided on Mapei Latexplan Trade for the screed which will be aprox 20mm thick. The data sheet states max 11mm per coat, however given there's going to be UFH pipes ran through the screed, if this sets and another layer is applied on-top will this affect the pipes/screed?