My first question is, my architect has not included a level threshold detail for my bifold doors. Can I differ from the drawing without having it approved? Can my BCI just approve a method?
can someone explain or show me the detail for a level threshold? (Beam and block floor)
I would’ve thought the cavity could be filled with lean mix concrete to support the insulation and screed crossing over, with dpm below and lapped onto external leaf dpc?
can someone explain or show me the detail for a level threshold? (Beam and block floor)
I would’ve thought the cavity could be filled with lean mix concrete to support the insulation and screed crossing over, with dpm below and lapped onto external leaf dpc?