Hi, just up in the loft checking insulation, when I discover two 4x2 joists left ‘hanging 50mm short of the wall plate, presumably post bedroom chimney removal. I’ve temporarily straddled them between good joists
with unistrut and pulled them up with 75mm screws!
My querie is whether there is a recognised acceptable way of extending these joists so they will sit on the wall plate? The loft will have no flooring, just insulation rolled out.
Cheers…..Phil.
with unistrut and pulled them up with 75mm screws!
My querie is whether there is a recognised acceptable way of extending these joists so they will sit on the wall plate? The loft will have no flooring, just insulation rolled out.
Cheers…..Phil.
Last edited by a moderator: