So I’ve moved into a new build at the end of March and just gotten around to trying to paint the plaster walls. I had a viewing in January and the walls had been plastered by then so they’ve had at least a few months to dry out.
Went in with a mist coat as recommended and made sure to dilute it down according to the directions on the tub. (Used Leyland Contract Matt).
As you can see from the photos the internal walls for the cupboard and the ceiling are fine but the other walls look an absolute mess. Is this a case of poor plastering, and will I need to get the contractors back out to sort it? It’s my son’s room and he has a disability so needs his own space, I was just wanting to paint it first so he had somewhere to go and get peace and quiet when he needs it but this has melted my head.
I’ve read it could be something called mapping and you can use a Zinsser primer over it but it’s not cheap and I don’t think I should be having to fork out more money if it’s a case of shoddy work.
Thanks for any help/advice you can offer!
Went in with a mist coat as recommended and made sure to dilute it down according to the directions on the tub. (Used Leyland Contract Matt).
As you can see from the photos the internal walls for the cupboard and the ceiling are fine but the other walls look an absolute mess. Is this a case of poor plastering, and will I need to get the contractors back out to sort it? It’s my son’s room and he has a disability so needs his own space, I was just wanting to paint it first so he had somewhere to go and get peace and quiet when he needs it but this has melted my head.
I’ve read it could be something called mapping and you can use a Zinsser primer over it but it’s not cheap and I don’t think I should be having to fork out more money if it’s a case of shoddy work.
Thanks for any help/advice you can offer!