Need help with Pyronix v11 control panel

Joined
14 Feb 2023
Messages
22
Reaction score
0
Country
United Kingdom
Hi, I am doing some renovation knocking a wall down and need to move a pyronix control panel. I need to disconnect it from the electric and it will be off for about a week. What is the best way to do this please. Do I have to disable all inputs first? Then add them again when I put the panel back up? Or is there an easier way? Do I need to take the battery out the control panel?
 
Last edited:
Put it on a plug top and lead ….then you won’t have to do anything with it ….
I have wired a master blaster alarm straight into the control panel, I need to undo that before i can more it. So the only way is to shut it all down.
 
Back
Top